Day: 29 August 2023

Flanged Steel Pipe Fittings Before and After Packaging

The situation of flanged steel pipe fittings before and after packaging is typically as follows: Before Packaging: 1. Cleaning and Inspection: Prior to packaging, flanged steel pipe fittings are usually cleaned and inspected to ensure that their surfaces are free from significant dirt, corrosion, or damage. 2. Protective Measures: If the surfaces of the fittings […]